Skip to main content

Thesis Draft....

Have got back my thesis draft. It was a long wait indeed (after 7 months). Some of the candidates got theirs in a month. Talking about efficiency and luck. Well, I've got to do some correction in some of the parts. Not a big deal but it's a head cracking job as I've been "away" from academic writing for a long period.

Comments

Anonymous said…
at least your Masters is coming soon.

Popular posts from this blog

The wedding of ....

This wedding has some similarity with ours but, by comparison in every detail, each is still distinctly unique.

Tateyama Kurobe Alpine Route

Just came back from Japan last week. Went to Tokyo for conference and added side trip to Tateyama Alpine Route and Kanazawa. I must say that Tateyama Kurobe Alpine Route was great. You can do the trip either from Nagano side or Toyama side. For us, we did it from the Nagano side. Took the Shinkansen to Nagano early morning. Then boarded the express bus to Ogizawa. From there, we boarded the tunnel electric bus to get to Kurobe Dam. From the dam, it was all the way up to the peak (almost). Murodo is the highlight of the route. This is the place where you get to see snow covered peak and lake. In spring, there's snow wall nearby Murodo station. From Murodo, we descended to Bijodaira and Tateyama Station to catch the local train back to Toyama. The fare for the entire route is not cheap, but it's worth it. A hike from Bijodaira to Murodo should be interesting, which can be considered in future. View from the tunnel electric bus, onward to Kurobe Dam Arrived at Kurobe Dam View of t...

MyVi

Had got my new MyVi last Friday. Initial consumption was a litre for a 10-km drive. Well, it seems quite costly but this is still early to judge as the engine needs up to 5,000km drive to get optimize (that's what people tell me). Enjoy driving it.